We are busy working on our case study.
Please have a look at at our other projects in the mean time.
Home
>
ResidentialMechanical & ElectricalFit out
>
Text Link
This is some text inside of a div block.
Home
>
ConstructionM&EModular
>
British Red Cross
British Red Cross
Site
British Red Cross headquarters
Duration
4 weeks

With major refurbishment works due at the British Red Cross HQ in Moorgate, the consultant team highlighted a lack of M&E information and documentation required for their design work. Newtons were tasked with conducting a full validation survey on all existing mechanical and electrical services.


Works were carried out both in hours and out of hours were necessary across a 4-week period. Including but not limited to; generator load bank testing, ventilation flow rates, mapping access control and fire alarm infrastructure and a full map of electrical low voltage distribution and test.


We were able to work closely with the consultants, the quantity surveyors and the on site facilities team to ensure these works were carried out efficiently and with minimal disruption to the working environment.

Other Construction projects
Other Modular projects
Other M&E projects